Best practices for taking measurements and providing guidance for bidding/procurement:
- Take a picture of the room.
- Check the verticals and flatness of the walls with which the development is to be connected and the angles between them.
- Measure the entire room:
a) Distances between the side walls at three heights (about 20 cm, about 1 m and about 2 m from the floor) where the front wall will run (that is, measuring at the depth of the booths/not at the back wall) – important for type I development
b) For full-height development of the room, preferably in several places on the development line. - Measure the distance of sewer inlet leads (axes of geberits) from one of the side walls. It is important to measure all distances from the same wall.
- In the case of geberite development in the form of a shelf, measure the widths and heights of this shelf in places where walls (both partitions and side walls) are expected.
- Checking whether there are any additional obstructions (radiators, central heating pipes, protruding sills, plinths, faults, etc.) at the place where the development is expected to connect to the fixed walls, and dimensioning them.
- In the case of underfloor heating, determine the location of such heating.
- Establish together with the investor his specific technical expectations (e.g., door opening directions, door width, etc.).
Do you want ALSANIT to take care of the measurement?
Step 1
Call 67 253 23 60
Contact us to arrange the details! Measurement is performed by ALSANIT specialists, who also offer technical advice.
Step 2
Order
Remember that the measurement is done after the order is placed, based on the design and specifications received.
Step 3
Make a payment
Installation is an extra charge service. After placing your order, remember to pay so that we can set up a measurement date.
step 4
Confirm readiness
The room ready for measurement must be cleaned up, with finished floor and walls (at least to the height of the building).